Insights
Stay up to date
Poor Supplier Data Quality Delays Digital Delivery — And How We Fix It
22/04/2026
Missed handovers, incomplete briefs, rework cycles — these are avoidable. But only if quality control is built into the surface design process, not applied at the end.
Inside the Overnight Workflow: A US OEM Case Study
09/04/2026
When a major US OEM needed rapid A-Class surfacing across multiple live programmes, Kadence deployed Surface Design Liaison Michael Coyne directly to Detroit — embedded within the client's design and engineering teams.
Car Design News – People Awards 2025
09/12/2025
On the 4th of December 2025 Kadence Hosted a Table at Car Design News - People Awards 2025